A multibeam survey is quoted from a line spacing, and the spacing is not a property of the sonar. It is the answer to a division run backwards: what coverage and overlap your deliverable owes, at what depth, at which swath setting. Fix those three inputs and the area divides into line-kilometres and hours you can defend in front of a client. Skip them and the quotation is a guess with a decimal point.
Why can't you price a multibeam survey from a swath width?
Because a swath width is a geometry at one depth and one angle, and it weakens towards its edges.
Scott Waite, a certified hydrographer writing for Prudent Engineering, describes a multibeam swath as typically spanning two to three times the water depth. That is a rule of thumb for the middle of a fan, not a value for your project. A 2023 Applied Sciences paper on estimating the survey time of a multibeam echo sounder, from the Polish Naval Academy's department of navigation and marine hydrography, derives line spacing from average depth and the usable swath angle — and then warns that opening the angle to shorten a job enlarges the outer-beam footprint: resolution falls, and the depths registered may be unacceptable to the client or to the hydrographic office.
A calculator built for this trade makes the trade visible. SPH Engineering's multibeam echo sounder calculator takes average depth, overlap and cross-track beamwidth, and returns swath width, line separation and an estimated bottom resolution of the swath width divided by 16 beams. Widen the fan and the spacing grows while the resolution coarsens: one input, two answers pulling against each other, and one of them is a cost.
So put the swath into the quotation as an assumption with a value and a reason. Never as a multiplier on the area.
What overlap does your deliverable actually require?
Whoever wrote your specification decides that; what your platform does with the overlap is yours to prove.
The two published approaches are not the same statement, and mixing them is how a quotation loses a line. The Applied Sciences method treats overlap as a percentage of the usable swath, with values from 10% to 25%, and calls the band where adjacent lines both measure 200% bottom coverage. R2Sonic's 2017 training note Multibeam Surveying, by chief hydrographic engineer C.W. Brennan, asks for 100% overlap between adjacent lines for a different reason: roll changes coverage on each side of the vessel, a helmsman working the line lets it wander, and an unexpected shoal narrows the swath exactly where the coverage was thin. That note also fixes the geometry that matters — swath width is a function of water depth, so spacing cannot be a constant, and lines are planned along the contours rather than across them, because nadir beams give the poorest definition of a slope and the outer beams the best.
Coverage along the track is a speed condition, not a spacing one. The same paper calculates a maximum survey speed from the along-track beamwidth, the speed of sound and the swath angle: at 10 m of depth, a 140° swath and a 0.5° along-track beamwidth, it works out at about 4.3 kn. The speed that fills your spacing sideways can be too fast to fill it front to back. R2Sonic adds an item measured in minutes rather than kilometres: allowance for run-in after a turn, so the motion sensor and gyro settle before logging starts.

Two questions settle it before the estimator opens. Does your specification state an overlap at all, and does it state that overlap as a percentage of the usable swath, or give a coverage figure instead? The 2023 paper's overlap band is 200% bottom coverage whatever its width; the width is what a spacing needs, and it is the number a coverage figure leaves out. If the instrument itself is new to you, our note on the fan-shaped sounder sets out what the term covers and what it does not certify.
What has to be true of the hull before a spacing means anything?
Three published numbers, and top speed is not one of them: the equipment-only payload, the draft, and the mounting opening.
These are the four hulls we would put on a shortlist for a survey configuration. No two of them publish those three the same way.
| Hull | Equipment-only payload | Draft | Mounting |
|---|---|---|---|
| KOI TURBO | 20 kg (50 kg with battery + equipment) | 28 cm | 250 mm through-hull moon pool; custom metal brackets and interfaces |
| HUNTER-X | 20 kg (35 kg with battery + equipment) | 20 cm | tool-free adjustable mounting; large instrument compartment |
| HUNTER | 50–60 kg, with no stated battery basis | 30 cm | instrument options including multibeam sonar |
| Seeker | 300 kg | 400 mm (lightship 1,300 kg; full load 1,600 kg) | dual moon pools and a rail-mounted payload system |
Read the two columns together and the range runs from 20 kg of equipment at 200 mm of draft to 300 kg at 400 mm, with HUNTER's 50–60 kg at 300 mm in between. That is the trade a multibeam requirement forces. A head, a bracket, a cable and the positioning that has to sit beside it all come out of the equipment-only figure, and where a brochure prints one load figure without saying whether the battery is inside it, as HUNTER's does, that is the first question.
Draft then gets over-read. It says where the hull floats, not where the transducer face sits; that depends on the bracket, and a through-hull opening is a diameter rather than a fit. KOI TURBO documents its 250 mm moon pool for ADCPs, CTDs, water-quality analysers and samplers, with custom metal brackets and interfaces available — the document lists those instruments, not a sonar head.

HUNTER-X publishes the same 20 kg equipment-only payload as KOI TURBO, at a draft 80 mm shallower, with a tool-free adjustable mount and a large instrument compartment. Which hull even names a sonar matters too. HUNTER's brochure lists a multibeam sonar among its optional instruments, KOI TURBO documents a single-beam echo sounder with dual RTK antennas and a standard data output, and HUNTER-X and Seeker describe mounting provisions rather than a named sonar option. Treat a multibeam fit as a configuration question answered from the manufacturer's drawings — bracket, opening, interfaces, power — and not from a platform's headline payload.
How do you turn a spacing into a survey day?
Divide the area by the spacing for line-kilometres, divide that by speed over ground for sailing hours, then add the minutes a division cannot see.
That is the whole of the time estimate we publish: main-line length ≈ area ÷ spacing, sailing time = length ÷ speed over ground, and a total that is sailing time plus the whole-job minutes you type in, turns and battery changes included. No signup is needed.
It is also deliberately narrow, and its own notes say so. It does not choose a spacing, does not calculate swath coverage and does not verify accuracy. It counts no route geometry, boundaries, obstacles, lines or turns. Transit, crosslines, launch and recovery, calibration, sound-speed work, quality re-runs, weather and current delays and post-processing are not in it, so they belong in the minutes you add. Its answer is a workload, not a schedule.
The 2023 paper lists the same items as separate terms of a total: main lines, crosslines, patch test, cross-check manoeuvres, transit, weather delay, equipment failure and the investigation of objects found. It reports that external factors can extend a survey by 5–20%, and notes that crosslines are governed in their own right — IMCA recommends at least two, larger areas are crossed every 1–5 km, and the Canadian standards cap crossline spacing at fifteen times the main-line spacing. None of that is a spacing. All of it is time your day spends.
For speed over ground, use what the platform will hold on the line rather than what it can do. KOI TURBO cruises at 1.0 m/s, HUNTER-X at 1.5 m/s and Seeker at 4 kn, all as published manufacturer figures — and the along-track coverage limit above may put your survey speed below any of them.
What should the quotation state so the day survives?
The inputs, in the order you used them, so the next person can re-run them:
- The spacing, and the depth it was computed at.
- The usable swath angle, and what it costs in resolution.
- The overlap, defined — percentage of usable swath, or coverage class.
- The speed over ground, and whether it is a cruise figure or a coverage limit.
- The whole-job minutes, itemised, with crosslines, calibration, transit and delays named.
- Who supplies positioning and corrections, and who processes the data.
- The acceptance check: which specification, which order, and who signs it off.
What we answer for is the platform and its configuration. The sonar, its software and the acceptance check belong to the instrument supplier and to your client's specification, and we coordinate the configuration with the manufacturer rather than certifying a survey.
Send the area, the depth range, the deliverable and the instrument you intend to fit, and we will take the platform side of that list — payload, draft, mounting and handling — as far as the manufacturer's drawings allow. Tell us the area, the depths and the deliverable, and start from how a survey configuration is put together before you compare hulls.
Filed under Hydrographic Survey
Back to Blog