Hydrographic Survey Time Calculator

Estimate survey-line workload and compare three time plans before discussing a USV configuration. Enter your own line spacing; no signup is required.

Planning principle only. Not a route, sonar footprint or coverage assessment.

Compare survey plans

View results

Editable calculation examples, not recommended survey settings or USV performance figures. Start by replacing the area and each plan's inputs.

Plan A

Additional time (min)

Plan B

Additional time (min)

Plan C

Additional time (min)

Enter total minutes for the whole job, not minutes per turn or battery change. Enter 0 where not applicable.

Estimated workload and time

Time comparison only. Wider spacing or a higher speed does not establish suitable coverage, data quality or achievable USV performance. Results are rounded to 2 decimals.

Plan A

Estimated total

— h

Main survey lines
— km
On-line sailing
— h
Added time
— h

Compared with Plan A—

Complete valid inputs to see this result.

Plan B

Estimated total

— h

Main survey lines
— km
On-line sailing
— h
Added time
— h

Compared with Plan A—

Complete valid inputs to see this result.

Plan C

Estimated total

— h

Main survey lines
— km
On-line sailing
— h
Added time
— h

Compared with Plan A—

Complete valid inputs to see this result.

Your selected inputs and estimate will be added to the project brief for review. Add the site, depth range, survey deliverables and intended instruments before sending.

Discuss a USV configuration for this survey

Calculations run in your browser. No email is needed to use the tool; nothing is sent as an inquiry until you review and submit the quote form.

Method and limits

Estimated main-line length
L (m) ≈ A (m²) ÷ s (m). The area approximation assumes parallel lines at a constant spacing; it does not generate or count actual lines.
Sailing and total time
Sailing time (h) = L (m) ÷ speed over ground (m/s) ÷ 3,600. Total (h) = sailing time + (turn + battery-change + other minutes) ÷ 60.
Unit conversions
1 ha = 10,000 m²; 1 km² = 1,000,000 m²; 1 kn = 1,852 m/h; 1 m/s = 3.6 km/h. Changing a unit converts the current valid value, rather than changing its physical quantity.

Planning assumptions

  • Choose spacing from the actual sonar, water depths, overlap and deliverable requirements. This tool does not recommend spacing, calculate swath coverage or verify accuracy.
  • No route geometry, boundaries, obstacles, actual line/turn count or battery-change count is calculated. For small or irregular areas, area ÷ spacing can differ materially from a planned route.
  • Transit, crosslines, launch/recovery, calibration, sound-speed work, quality re-runs, weather/current delays and post-processing are not automatically included. Add relevant time to Other time.
  • Use a realistic survey speed over ground. There is no endurance, battery, current, sensor-rate or vessel-performance model. This approximation is not a validated operational schedule, safety plan or quotation.

Free project brief generator

Organize your survey, sampling, underwater inspection or aquaculture net-cleaning task into a project brief with equipment types to discuss, configuration checks and missing information.

No signup. Copy, download or carry the brief to a quote request; no automatic model selection.

Build a project brief